If you wish to contribute or participate in the discussions about articles you are invited to contact the Editor

EGNOS Performances

From Navipedia
Revision as of 18:04, 30 March 2011 by Jose.Caro (talk | contribs)
Jump to navigation Jump to search


EGNOSEGNOS
Title EGNOS Performances
Author(s) GMV.
Level Basic
Year of Publication 2011
Logo GMV.png

EGNOS performances are usually described in terms of accuracy, integrity, availability and continuity.

EGNOS Performances Requirements

The performances required to EGNOS as per the EGNOS Mission Requirement Document[1] are presented in the following table.

Service Service Coverage Accuracy (95%) Integrity Continuity Availability
Lateral Vertical HAL VAL TTA Integrity Risk
Open Service EU25 States (plus Norway and Switzerland) land masses 3m 4m - - - - - 99%
SoL En-route and NPA FIRs of ECAC 96 220m - 556m - 10s 1e-7/hour 1e-5/hour 99.9%
SoL APV-I Land Masses of ECAC 96 16m 20m 40m 50m 6s 2e-7/150s 8e-6/15s 99%

Monitoring of EGNOS Performances

EGNOS performances are being monitored continuously by several entities, such as ESSP[2] and ESA.[3]

The EGNOS performance monitoring done by ESSP[2] includes figures on achieved availability, continuity and integrity. In addition, it forecasts the performances in terms of availability and integrity.

The monitoring done by ESA[3] is twofolded. On the one hand, the messages, as broadcast by the EGNOS satellites, are analysed to determine the status of several parameters, such as the GPS satellites which are augmented by EGNOS, the level of monitoring of the ionosphere over Europe or the achieved protection levels. On the other hand, ESA monitoring environment allows to select different reference stations and depicts the accuracy and integrity obtained for those sites.

Typical Performances

Early 2011, the performances provided by EGNOS are presented in next figures – for day 7th Feb. 2011, considered to be a representative day. The actual EGNOS messages have been taken from the EGNOS Message Server. The images have been generated with the eclayr tool.

Notes

References

  1. ^ EGNOS Mission Requirements Document, version 2.0, 8th May 2006, Galileo Joint Undertaking
  2. ^ a b EGNOS performances by ESSP
  3. ^ a b EGNOS performances by ESA