If you wish to contribute or participate in the discussions about articles you are invited to contact the Editor

MSAS Performances: Difference between revisions

From Navipedia
Jump to navigation Jump to search
No edit summary
(No difference)

Revision as of 07:40, 5 August 2011


MSASMSAS
Title MSAS Performances
Author(s) GMV.
Level Basic
Year of Publication 2011
Logo GMV.png


The MTSAT Satellite Augmentation System (MSAS) is the Japanese Satellite Based Augmentation System (SBAS) System:[1] a GPS Augmentation system with the goal of improving its accuracy, integrity, and availability, and that uses the Multifunctional Transport Satellites (MTSAT) owned and operated by the Japanese Ministry of Land, Infrastructure and Transport and the Japan Meteorological Agency (JMA).

First tests were accomplished successfully, and MSAS system for aviation use was declared operational in September 27, 2007,[2][3] providing a service of horizontal guidance for En-route through Non-Precision Approach.[1][2][4]


MSAS Performances

MSAS for aviation use was commissioned on September 27, 2007. MSAS provides service for air navigation with the following characteristics:[4]

  • 24 hours a day, 7 days a week.
  • Operational Information is provided as notice to airmen (NOTAM).[5]
  • Use for En-route through Non Precision Approach (NPA) phase of flight, horizontal guidance only.
  • Service over the Fukuoka Flight Information Region.

Performances are usually described in terms of accuracy, integrity, availability and continuity. The MSAS Performance Requirements Vs. observed performances for En-route through Non Precision Approach (NPA) phase of flight are:[4]

  • Horizontal Accuracy (95%)
    • Required : Less than 220m (with SA on)
    • Observed value is less than 2.2m
  • Integrity (Probability of HMI)
    • Required : Less than 1x10-7/hour
    • Fault Tree Analysis leads 0.903x10-7/hour
  • Availability
    • Required : More than 99.9%
    • Observed : 99.926%

For the near future, there is a plan under development with the following priorities:

  • Support LPV-200 capability (additional GMS, software improvement).
  • Changes for transition to dual frequency SBAS (L1-L5) operations.

Notes

References