If you wish to contribute or participate in the discussions about articles you are invited to contact the Editor
File:Egnos ref apv1.png: Difference between revisions
Jump to navigation
Jump to search
(Service Area against which the APV-I is to be achieved over 99% of time for both operational EGNOS GEO satellites, GEO 120 and 124. (Source: [http://www.essp-sas.eu/downloads/hibt/essp_dil51_r2010p_01_02.pdf EGNOS Yearly Report].)) |
m (Change of link) |
||
Line 1: | Line 1: | ||
== Summary == | == Summary == | ||
Service Area against which the APV-I is to be achieved over 99% of time for both operational EGNOS GEO satellites, GEO 120 and 124. (Source: [http://www.essp-sas.eu/ | Service Area against which the APV-I is to be achieved over 99% of time for both operational EGNOS GEO satellites, GEO 120 and 124. (Source: [http://www.essp-sas.eu/printed_documents EGNOS Yearly Report].) | ||
== Licensing == | == Licensing == | ||
{{subst:No license from license selector|Don't know}} | {{subst:No license from license selector|Don't know}} |
Latest revision as of 16:31, 7 April 2011
Summary
Service Area against which the APV-I is to be achieved over 99% of time for both operational EGNOS GEO satellites, GEO 120 and 124. (Source: EGNOS Yearly Report.)
Licensing
{{subst:No license from license selector|Don't know}}
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 21:54, 31 March 2011 | 780 × 554 (428 KB) | Jose.Caro (talk | contribs) | Service Area against which the APV-I is to be achieved over 99% of time for both operational EGNOS GEO satellites, GEO 120 and 124. (Source: [http://www.essp-sas.eu/downloads/hibt/essp_dil51_r2010p_01_02.pdf EGNOS Yearly Report].) |
You cannot overwrite this file.
File usage
There are no pages that use this file.