If you wish to contribute or participate in the discussions about articles you are invited to contact the Editor
GAGAN: Difference between revisions
No edit summary |
No edit summary |
||
Line 13: | Line 13: | ||
In August 2001 the [http://www.airportsindia.org.in Airports Authority of India] and the [http://www.isro.org Indian Space Research Organization (ISRO)] reached an agreement for the establishment of the GAGAN system.<ref>Grewal et al., ''Global positioning systems, inertial navigation, and integration'', Wiley-Interscience, 2007</ref> | In August 2001 the [http://www.airportsindia.org.in Airports Authority of India] and the [http://www.isro.org Indian Space Research Organization (ISRO)] reached an agreement for the establishment of the GAGAN system.<ref>Grewal et al., ''Global positioning systems, inertial navigation, and integration'', Wiley-Interscience, 2007</ref> | ||
The development plan consists of | The development plan consists of two different phases:<ref name="GAGAN_ICG8">[http://unoosa.org/pdf/icg/2013/icg-8/5.pdf ''IRNSS and GAGAN status Presentation''] S. Sayeenathan, ICG -8, DUBAI, November 2013</ref> | ||
# Technology Demonstration System (TDS) | #Technology Demonstration System (TDS); | ||
# Initial Experimental Phase (IEP) | # Initial Experimental Phase (IEP); | ||
#Final Operational phase (FOP). | #Final Operational phase (FOP). | ||
The TDS phase was completed in August 2007 using the navigation payload of the INMARSAT 4F1 satellite. The Initial Experimental Phase (IEP), planned to be finished by 2009, is | The TDS phase was completed in August 2007 using the navigation payload of the INMARSAT 4F1 satellite. The Initial Experimental Phase (IEP), initially planned to be finished by 2009, is currently being implemented concurrently with TDS Phase. | ||
On 15 April 2010, it was attempted to launch the first GAGAN navigation payload. The equipment was installed in the satellite, GSAT-4, but, unfortunately, the launch failed and the GEO satellites never reached its nominal orbit<ref>[http://www.thehindu.com/news/article398070.ece ''India’s own cryogenic rocket launch fails'']The Hindu news, 15th April 2010</ref>. In May 2011, the GSAT-8 satellite carrying a GAGAN SBAS payload was successfully launched by the Ariane-V launch vehicle of Arianespace from Kourou, French Guiana<ref>[http://www.gpsworld.com/gnss-system/augmentation-assistance/news/india-successfully-launches-gagan-sbas-satellite-11664 India Successfully Launches GAGAN SBAS satellite, GPSWorld, May 2011]</ref>. Later on 28 September 2012, another Ariane 5 rocket successfully launched the India's GSAT-10 satellite which carries the second GAGAN payload<ref>[http://www.insidegnss.com/node/3227 India’s Second GAGAN Payload Heads into Space, InsideGNSS, September 2012]</ref>. | On 15 April 2010, it was attempted to launch the first GAGAN navigation payload. The equipment was installed in the satellite, GSAT-4, but, unfortunately, the launch failed and the GEO satellites never reached its nominal orbit<ref>[http://www.thehindu.com/news/article398070.ece ''India’s own cryogenic rocket launch fails'']The Hindu news, 15th April 2010</ref>. In May 2011, the GSAT-8 satellite carrying a GAGAN SBAS payload was successfully launched by the Ariane-V launch vehicle of Arianespace from Kourou, French Guiana<ref>[http://www.gpsworld.com/gnss-system/augmentation-assistance/news/india-successfully-launches-gagan-sbas-satellite-11664 India Successfully Launches GAGAN SBAS satellite, GPSWorld, May 2011]</ref>. Later on 28 September 2012, another Ariane 5 rocket successfully launched the India's GSAT-10 satellite which carries the second GAGAN payload<ref>[http://www.insidegnss.com/node/3227 India’s Second GAGAN Payload Heads into Space, InsideGNSS, September 2012]</ref>. | ||
Line 29: | Line 29: | ||
</gallery> | </gallery> | ||
The main components of the GAGAN Architecture are:<ref name=" | The main components of the GAGAN Architecture are:<ref name="GAGAN_ICG8"/> | ||
*Space segment: three operational GEO satellites<ref name="currProg">[http://www.isro.org/scripts/currentprogrammein.aspx#Navigation Current Programme, Indian Space Research Organization]</ref><ref name=" futProg">[http://www.isro.org/scripts/futureprogramme.aspx#Forth Future Programme, Indian Space Research Organization]</ref>: The GSAT-8 and GSAT-10 satellites were successfully launched in March 2011 and April 2012, respectively. The remaining satellite is schedule to be launched during 2014 aboard an Arianne 5 launch vehicle<ref name="futProg"/><ref>[http://www.arianespace.com/news-press-release/2013/11-14-2013-GSAT-contract.asp "Arianespace to launch GSAT 15 and GSAT 16 satellites for India", Evry, November 14, 2013]</ref>. | *Space segment: three operational GEO satellites<ref name="currProg">[http://www.isro.org/scripts/currentprogrammein.aspx#Navigation Current Programme, Indian Space Research Organization]</ref><ref name=" futProg">[http://www.isro.org/scripts/futureprogramme.aspx#Forth Future Programme, Indian Space Research Organization]</ref>: The GSAT-8 and GSAT-10 satellites were successfully launched in March 2011 and April 2012, respectively. The remaining satellite is schedule to be launched during 2014 aboard an Arianne 5 launch vehicle<ref name="futProg"/><ref>[http://www.arianespace.com/news-press-release/2013/11-14-2013-GSAT-contract.asp "Arianespace to launch GSAT 15 and GSAT 16 satellites for India", Evry, November 14, 2013]</ref>. |
Revision as of 18:03, 31 January 2014
Other SBAS | |
---|---|
Title | GAGAN |
Edited by | GMV |
Level | Basic |
Year of Publication | 2011 |
The GPS Aided Geo Augmented Navigation system (GAGAN) is the SBAS implementation by the Indian government.
GAGAN Introduction
In August 2001 the Airports Authority of India and the Indian Space Research Organization (ISRO) reached an agreement for the establishment of the GAGAN system.[1]
The development plan consists of two different phases:[2]
- Technology Demonstration System (TDS);
- Initial Experimental Phase (IEP);
- Final Operational phase (FOP).
The TDS phase was completed in August 2007 using the navigation payload of the INMARSAT 4F1 satellite. The Initial Experimental Phase (IEP), initially planned to be finished by 2009, is currently being implemented concurrently with TDS Phase.
On 15 April 2010, it was attempted to launch the first GAGAN navigation payload. The equipment was installed in the satellite, GSAT-4, but, unfortunately, the launch failed and the GEO satellites never reached its nominal orbit[3]. In May 2011, the GSAT-8 satellite carrying a GAGAN SBAS payload was successfully launched by the Ariane-V launch vehicle of Arianespace from Kourou, French Guiana[4]. Later on 28 September 2012, another Ariane 5 rocket successfully launched the India's GSAT-10 satellite which carries the second GAGAN payload[5].
GAGAN Architecture
GAGAN overview.[6]
The main components of the GAGAN Architecture are:[2]
- Space segment: three operational GEO satellites[7][8]: The GSAT-8 and GSAT-10 satellites were successfully launched in March 2011 and April 2012, respectively. The remaining satellite is schedule to be launched during 2014 aboard an Arianne 5 launch vehicle[8][9].
- Ground segment: On the ground, the GPS data is received and processed in the 8 Indian Reference Stations (INRES), located at Delhi, Ahmedabad, Bangalore, Thiruvananthapuram, Kolkata, Guwahati, Port Blair and Jammu.[10] The Indian Master Control Center (INMCC), located at Bangalore, processes the data from the INRESs to compute the differential corrections and the estimate of its level of integrity. The SBAS message generated by the INMCC is uplinked to the GEO satellite through its corresponding Indian Land Uplink Station (INLUS).[11] In its operational configuration, GAGAN will have 15 INRES, two INMCC, and three INLUS. The additional INRES will be located in Indore, Bhuj, Amritsar, Chennai, Nagpur, Lucknow and Visakhapatnam.[12]
- User segment: GAGAN-enabled GPS receivers, with the same technology as WAAS Receivers, capable to use the GAGAN Signal-in-Space (SIS). User equipment for civil aviation shall be certified against several standards (see article SBAS Standards).
The company Raytheon was awarded in 2009 of the contract to build the complete GAGAN system.[13]
GAGAN Signals and Performances
The GAGAN GEO satellites will broadcast SBAS navigation data using L1 and L5 signals, with Global Positioning System (GPS) type modulation.[6] The specification of the SBAS message data format is contained in the ICAO SARPS Appendix B for the aspects related with the signal in space, as well as in the RTCA MOPS DO-229D for the minimum performance requirements applicable to the airborne SBAS receiver equipment. The format of the messages is thoroughly explained in the article The EGNOS SBAS Message Format Explained. (See the article SBAS Fundamentals for more information.)
The performance objectives of the Final Operational Phase of the GAGAN system are:[12]
- RNP 0.1 en route navigation in India Flight Information Region (FIR).
- APV-2 over the land masses in India FIR.
Ionospheric issues
One of the main concerns about an SBAS implementation in India is the ionospheric behavior at these latitudes, as India is located in the equatorial ionospheric anomaly belt. The ionosphere near the geomagnetic equator has physical process and features that rarely affect mid-latitudes. These include the Appleton geomagnetic anomaly, plasma bubbles, and scintillations.
Free from adverse ionospheric effects, current SBAS in the mid magnetic latitudes provide vertical guidance for the single frequency users. The ionosphere equatorial anomaly and the ionospheric phenomena typically found at equatorial latitudes, produce large spatial gradients and temporal gradients in the ionospheric delay. This significantly challenges SBAS to meet the stringent requirements associated to precision guidance. The macroscopic effects (equatorial anomaly) are not well approximated with the 5 x 5 degree grid thin shell model specified in the current SBAS Standards. Also, the microscopic phenomena (plasma bubbles) cause sharp gradients during a short period of time (less than 5 minutes). If these small scale features are not observed or alerted by the SBAS system, it would make difficult to ensure integrity compatible with the precision approach alert limits. Finally, the user equipment and the reference stations of the SBAS system might suffer from tracking and noise problems because of scintillation, which is a particularly likely problem in equatorial latitudes depending on the season and day time. All these problems are under study by several groups and different approaches for an SBAS implementation in equatorial magnetic regions have been presented.[14][15][16][17][18]
The approach followed in the GAGAN system is to cope with some of these phenomena at the user receiver level.[12]
References
- ^ Grewal et al., Global positioning systems, inertial navigation, and integration, Wiley-Interscience, 2007
- ^ a b IRNSS and GAGAN status Presentation S. Sayeenathan, ICG -8, DUBAI, November 2013
- ^ India’s own cryogenic rocket launch failsThe Hindu news, 15th April 2010
- ^ India Successfully Launches GAGAN SBAS satellite, GPSWorld, May 2011
- ^ India’s Second GAGAN Payload Heads into Space, InsideGNSS, September 2012
- ^ a b GPS Aided Geo Augmented Navigation on Wikipedia
- ^ Current Programme, Indian Space Research Organization
- ^ a b Future Programme, Indian Space Research Organization
- ^ "Arianespace to launch GSAT 15 and GSAT 16 satellites for India", Evry, November 14, 2013
- ^ Cite error: Invalid
<ref>
tag; no text was provided for refs namedGAGAN_COSPAR
- ^ GAGAN: The Satellite Based Navigation System, India Current Affairs, August 10, 2010
- ^ a b c A S Ganeshan (ISRO), GAGAN Signal In Space – Testing & Utilisation, August 5-7, 2009
- ^ ISRO Extends Raytheon Contract for GAGAN GPS Augmentation System Inside GNSS News July 2009
- ^ Doherty, Patricia et al., "Ionospheric Effects on Low-Latitude Space Based Augmentation Systems", proceedings of ION GPS, Portland, OR, September 2002.
- ^ Lejeune, R. et al., "Adequacy of the SBAS Ionospheric Grid Concept for Precision Approach in the Equatorial Region", proceedings of ION GPS, Portland, OR, September 2002.
- ^ Wu, S. et al., "A Single Frequency Approach to Mitigation of Ionospheric Depletion Events for SBAS in Equatorial Regions", ION GNSS 2006.
- ^ Cormier, D., et al., "Providing Precision Approach SBAS Service and Integrity in Equatorial Regions," Proceedings ION GPS/GNSS 2003, Portland, OR, September 2003.
- ^ Shukla, A.K., et al,‘’Two-Shell Ionospheric Model for Indian Region: A Novel Approach’’ IEEE Transactions on Geoscience and Remote Sensing, Aug. 2009 Volume: 47 Issue:8,Pages 2407 – 2412